Studies done in 97 indicated it would cost 2 billion to interconnect ERCOT with the Eastern Grid.
ERCOT customers are paying 5 billion building CREZ lines to bring T Bone Pickens proposed wind generation to the load areas.
T Bone is now not going to build all his promised wind generators. But the lines are still being built.
When grid operations meet political motives, no one wins.
“I doubt well see rolling black outs this summer.”
I love events. It brings out all the experts.
Nothing brings out the experts like a electric grid event.
I hope you are right.
Trust me, no one is trying to keep the lights on more than the ERCOT Operators.
T Bone, ask OSU about his promise.
ENRON Jr.
I’m sure the folks at ERCOT are doing all they can.