Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Stress test may have contributed to collapse of FIU pedestrian bridge
Miami Herald ^ | 15 March 2018 | By Jenny Staletovich, Rene Rodriguez And Joey Flechas

Posted on 03/16/2018 3:59:12 AM PDT by csvset

click here to read article


Navigation: use the links below to view more comments.
first previous 1-20 ... 41-6061-8081-100101-107 next last
To: Gen.Blather

Since instead of a bridge they ended up building a wall across the road, which will stay there until the forensic engineering inspection is done, that traffic interruption clause just maxed out. Meanwhile the FIU admin honchos, who were pushing over the edge engineering on a mere Ped Bridge, to produce a bragworthy landmark for their engineering school - who cares what it costs, we’ll get Obamabucks - got the rep they deserved. Next we’ll learn whether anyone in FL will give them the Rap (sheet) they deserve.


61 posted on 03/16/2018 6:03:05 AM PDT by JohnBovenmyer (Waiting for the tweets to hatch!)
[ Post Reply | Private Reply | To 44 | View Replies]

To: healy61

Oops......wrong thread....I wondered where it went.


62 posted on 03/16/2018 6:05:27 AM PDT by Liz ((Our side has 8 trillion bullets;the other side doesn't know which bathroom to use.))
[ Post Reply | Private Reply | To 49 | View Replies]

To: lastchance

Like the eco retrofit that burned down the London high rise recently, green lemmings.


63 posted on 03/16/2018 6:06:06 AM PDT by JohnBovenmyer (Waiting for the tweets to hatch!)
[ Post Reply | Private Reply | To 56 | View Replies]

To: csvset
Just about every over pass I see on highways and local roads have steel beams. Why the need for a cable stayed bridge for this; what should have been a mundane pedestrian footbridge? Oh, the Feds are on the hook, let’s splurge ?

According to one of the articles I've read they went with concrete to reduce vibrations. Evidently it was going to more than an overhead walkway. They were going to have benches and WI-FI access points so students could hangout.

64 posted on 03/16/2018 6:11:48 AM PDT by EVO X
[ Post Reply | Private Reply | To 43 | View Replies]

To: csvset

Sounds like a problem with pre tightening and post tightening in relation to moving the bridge around. Sounds like they may have cracked it during moving.


65 posted on 03/16/2018 6:14:06 AM PDT by jetson
[ Post Reply | Private Reply | To 1 | View Replies]

To: csvset
I used to do construction and one mantra was "if you don't start out right,you don't end up right." This whole idea was a disaster from the get go.
66 posted on 03/16/2018 6:14:47 AM PDT by 4yearlurker ("There stands mother under the oleanders,open the windows." A dying cowboys last words,1879.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: niteowl77

Concrete works great with compression loads. It fails easily under tension. The design most likely incorporated cables in the bottom of the beam/bridge that could be tightened to place the bottom of the beam/bridge in compression. I suspect the cables were tightened after the concrete cured and reached a specific strength. The tightening was calculated to allow the beam/bridge to be moved onto the piers. Then additional tensioning was applied to enable the bride to support additional loads other than the dead weight. During that process something got out of sync and the load exceeded what the concrete could withstand.


67 posted on 03/16/2018 6:16:33 AM PDT by meatloaf
[ Post Reply | Private Reply | To 20 | View Replies]

To: VTenigma

With VT in your screenname, I think you probably have a handle on this that’s not evident in other responses. Few people understand the post-tension concept. I first worked a building with post-tension concrete in 1987. Since then, it has made its way even into home construction as I have PT cables in the slab of my house that was constructed in 2008.


68 posted on 03/16/2018 6:18:02 AM PDT by T-Bird45 (It feels like the seventies, and it shouldn't.)
[ Post Reply | Private Reply | To 15 | View Replies]

To: trebb

Actually, I *am* an engineer, and that is what should have been done, traffic disruption or contact financial penalty be damned.


69 posted on 03/16/2018 6:21:01 AM PDT by nickedknack
[ Post Reply | Private Reply | To 19 | View Replies]

To: DuncanWaring
The bridge should have been strong enough to handle a full load of drunken college students, jumping up and down to see what happens.


Where could you find enough drunken college students who could jump up and down in unison?
70 posted on 03/16/2018 6:22:04 AM PDT by The_Media_never_lie (The MSM is the enemy of the American people.)
[ Post Reply | Private Reply | To 14 | View Replies]

To: csvset

Somewhere there exists an engineer who said don’t do this. He is soon to be fired


71 posted on 03/16/2018 6:22:13 AM PDT by BRL
[ Post Reply | Private Reply | To 1 | View Replies]

To: mewzilla

Stick to home ec,honey...no one dies.


72 posted on 03/16/2018 6:23:25 AM PDT by who knows what evil? (Yehovah saved more animals than people on the ark...www.siameserescue.com)
[ Post Reply | Private Reply | To 32 | View Replies]

To: csvset

Trumps tariffs caused this. They could not afford steel so went with concrete. /s


73 posted on 03/16/2018 6:25:41 AM PDT by pas
[ Post Reply | Private Reply | To 1 | View Replies]

To: niteowl77
Maybe the schools stopped teaching about empirical dead white guy engineering


Dead white guy engineering sent dead white guys to the moon, a feat that has not been repeated repeated in many years. It is also known as slide rule engineering.
74 posted on 03/16/2018 6:25:43 AM PDT by The_Media_never_lie (The MSM is the enemy of the American people.)
[ Post Reply | Private Reply | To 20 | View Replies]

To: shelterguy

Thanks Sherlterguy, you know exactly what I’m talking about. I used to get in trouble at my parties because all the guys were in the garage building or fixing something.


75 posted on 03/16/2018 6:29:01 AM PDT by Haddit (Minimalists Al Gore and Al Qaeda)
[ Post Reply | Private Reply | To 57 | View Replies]

To: The_Media_never_lie

Spring Break?


76 posted on 03/16/2018 6:31:23 AM PDT by DuncanWaring (The Lord uses the good ones; the bad ones use the Lord.)
[ Post Reply | Private Reply | To 70 | View Replies]

To: csvset

One would think there would some cctv footage of the bridge collapsing, particularly if “stress testing” was being conducted and FDOT officials were present at the time of the collapse.


77 posted on 03/16/2018 6:32:21 AM PDT by Godebert (CRUZ: Born in a foreign land to a foreign father.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: csvset
FIU started a center to “advance the frontier” in the field in 2010 after identifying a need for more engineers trained in the method. Since launching in 2011, the center has drawn 4,000 people to its webinars, according to the website. In 2016, it became one of just 20 accelerated building programs nationwide to receive federal funding that amounts to $10 million over five years.

The center was not formally involved in constructing the pedestrian bridge.

The center’s director, Atorod Azizinamini, recognized by the White House in 2016 as one of the world’s leading bridge engineers, said the method is safer and more efficient than conventional construction methods.

Obama’s democrat government, spending democrat money, by democrat politicians in a democrat-controlled city in a democrat congressional district? “We don't need no stinkin’ engineers!”

78 posted on 03/16/2018 6:44:21 AM PDT by Robert A Cook PE (I can only donate monthly, but socialists' ABBCNNBCBS continue to lie every day!)
[ Post Reply | Private Reply | To 1 | View Replies]

To: Godebert

I did see some cctv footage at DailyMail.com

Marko


79 posted on 03/16/2018 6:45:24 AM PDT by markoman (Nothing hard liquor and a hammer won't fix)
[ Post Reply | Private Reply | To 77 | View Replies]

To: VTenigma
Agree the odds favor your #15 analysis.

It seems clear the erection schedule provided for the structure to be in place prior to installation of the mid-span column and support cables - without support at the bottom in order to facilitate auto traffic. Ergo, the design team had calculated the structure could span the gap with its dead load. One would suppose the structure could have been substantially post-tensioned while yet on the ground once the fabrication process was completed.

OTOH, what are the odds this was a Hyatt walkway type of failure?

80 posted on 03/16/2018 6:45:24 AM PDT by frog in a pot (Obama's "Remaking of America" continues apace in the absence of political opposition.)
[ Post Reply | Private Reply | To 15 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-20 ... 41-6061-8081-100101-107 next last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson