Uh...problem with electrical loads...who would of thought?
First, they did not have the power strung out to the location, then tey had the wrong connectors on the power cables, then they finally allowed me to connect it up.
I powered it up and brought down the power to four buildings because they had patched me into a junction box without sufficient capability.
10-guage wires for 6-guage capacity. That’s gonna leave a mark. As in tearing up concrete floors and re-doing the wiring.
Not that I have any knowledge of this facility but I’ve seen this elsewhere.