Anyone else see a problem with taking an estimate based on construction costs in San Diego, and extrapolating that along the entire SW border?
Makes sense- except that barren desert will be a whole different ballgame in terms of construction and logistics. Legal costs are a different issue altogether.
These figures were taken from the Israeli wall.