Chuck says:
Exclusive--Must credit THE OIL DRUM and Chuck Watson of KAC/UCF. KAC/UCF and Chuck Watson are forecasting, based on their damage models, that the Qalhat (Sur) LNG terminal will be out for 20-30 days and the Mina al Fahal oil terminal will be down for 10-15 days--all of this assuming they are built to US standards.Credit to Chuck Watson KAC/UCF
I am going out on a limb and suggest that gas will spike by 15% in the next 36 hours.