It certainly wouldn't do to have to reset the main genset breaker during final to a carrier landing!
As long as the Pep Boys don’t suddenly appear on the HUD /obscure
“The power gap was caused by flawed design estimates based on the average power demand over several seconds”, says J D McFarlan, air vehicle integrated product team leader. “We’ll be billing this “cost overrun” to the various governments involved in the contract, over time, and hope to be greatly rewarded for our stupidity.”
400KW? That’s enough for 200 houses! Methinks that’s just a bit on the high side. That’s 540 horsepower used JUST for electrical generation.
I’m shocked.
we are in the age of electric jets.
Just install some solar panels.
How about a nuk. powered gen. Works great on nuk. subs.