Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Levitating train from L.A. to Las Vegas gets boost
AP ^

Posted on 06/08/2008 7:09:37 PM PDT by MinorityRepublican

WASHINGTON (AP) — Plans for a levitating train from Las Vegas to Disneyland can move forward under a transportation bill signed by President Bush on Friday that frees up $45 million for the futuristic project.

Derided by critics as pie in the sky, the train would use magnetic levitation technology to carry passengers from Disneyland to Las Vegas in well under two hours, traveling at speeds of up to 300 mph. It would be the first MagLev system in the U.S.

The money is the largest cash infusion in the project's nearly 20-year history. It will pay for environmental studies for the first leg of the project.

The money had been delayed by a drafting error in Congress' 2005 highway bill, which was corrected along with some other changes by the legislation signed Friday by Bush. The delay had allowed a competing and cheaper diesel-electric plan to emerge as an alternative, but with the money now freed up supporters hope to move forward with the MagLev plan.

The train is meant to ease traffic on increasingly clogged Interstate 15, the main route for the millions of Southern Californians who make the 250-plus-mile drive to Las Vegas each year. There is no train on the route — Amtrak's Desert Wind between Los Angeles and Las Vegas was canceled in 1997 because of low ridership.

Senate Majority Leader Harry Reid, D-Nev., praised passage of the law, saying the MagLev project "will safely and efficiently move people between Southern California and Las Vegas."

(Excerpt) Read more at ap.google.com ...


TOPICS: US: California; US: Nevada
KEYWORDS: lasvegas; maglev; rail; taxpayerscam; transportation

1 posted on 06/08/2008 7:09:37 PM PDT by MinorityRepublican
[ Post Reply | Private Reply | View Replies]

To: MinorityRepublican
Senate Majority Leader Harry Reid, D-Nev., praised passage of the law, saying the MagLev project "will safely and efficiently move people between Southern California and Las Vegas."

And I bet that some contractors on the project will be "friends" of his and he'll get a consulting fee of some sort. Hmmm, I wonder if he owns any real estate along thr route or at proposed stations in Las Vegas...
2 posted on 06/08/2008 7:15:28 PM PDT by Army Air Corps (Four fried chickens and a coke)
[ Post Reply | Private Reply | To 1 | View Replies]

To: MinorityRepublican

Idiots. $45 million dollars will pay only for more “studies.” Back when the Pioneer was canceled, it was due as much to UP opposition as anything. If the money was put into capacity improvements on the existing line, it could handle many more people at 80 mph or faster in a couple of years than spending on a pie-in the sky unproven technology. No, this is just more of Senator “Searchlight” Reid bringing home the bacon.

See additional discussion at (registration required, but the first page is free):
http://www.trainorders.com/discussion/read.php?4,1687035,page=1


3 posted on 06/08/2008 7:21:40 PM PDT by CedarDave (Obama dissing God and country: campaign won't use "religion as a wedge and patriotism as a bludgeon")
[ Post Reply | Private Reply | To 1 | View Replies]

To: MinorityRepublican

Bttt


4 posted on 06/08/2008 7:40:44 PM PDT by MinorityRepublican
[ Post Reply | Private Reply | To 1 | View Replies]

To: MinorityRepublican

Just more of the Federal government, aided by Democrats and a disappointly high number of Republicans, doing stuff the Constitution and the forefathers of our country, never meant to be done by the Feds.


5 posted on 06/08/2008 9:12:05 PM PDT by SoConPubbie (GOP: If you reward bad behavior all you get is more bad behavior.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: SoConPubbie

Bingo!


6 posted on 06/08/2008 9:35:50 PM PDT by BenLurkin
[ Post Reply | Private Reply | To 5 | View Replies]

To: MinorityRepublican

Somewhere out there, WillieGreen is smiling thinking how his lies and bribes have got another toy train built which will never be profitable without subsidies from joe taxpayer.


7 posted on 06/08/2008 9:52:27 PM PDT by Tailback
[ Post Reply | Private Reply | To 1 | View Replies]

To: MinorityRepublican

Bttt


8 posted on 06/09/2008 5:38:53 AM PDT by MinorityRepublican
[ Post Reply | Private Reply | To 4 | View Replies]

To: MinorityRepublican
a transportation bill signed by President Bush on Friday that frees up $45 million for the futuristic project.

Ya gotta love the Associated Press. The $45 million was "freed up." It used to be held captive, in the place where the federal government keeps all of its extra money.

    $45 million

If this were going to actual construction, instead of being pissed away on Green Weenie consultants, it would build at least 20 feet of the exciting maglev train.

    Amtrak's Desert Wind between Los Angeles and Las Vegas was canceled in 1997 because of low ridership.

And that was because of Southwest Airlines. By the way, Southwest Airlines still exists. They don't have any maglev trains, but they can get you from Orange County to Las Vegas in an hour and 5 minutes.


9 posted on 06/09/2008 2:07:32 PM PDT by Nick Danger (Ding dong the witch is dead!)
[ Post Reply | Private Reply | To 1 | View Replies]

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson