http://en.wikipedia.org/wiki/Beechcraft_T-6_Texan_II
The T-6 is a development of the Pilatus PC-9, modified significantly by Beechcraft in order to enter the Joint Primary Aircraft Training System (JPATS) competition in the 1990s.[1] A similar arrangement between Pilatus and British Aerospace had also been in place for a Royal Air Force competition in the 1980s, although this competition selected the Short Tucano. The aircraft was designated under the 1962 United States Tri-Service aircraft designation system and named for the decades-earlier T-6 Texan.
The Beechcraft brand has since been purchased from Raytheon by Onex Corporation, a Canadian “private equity fund” which retained the name Hawker Beechcraft.[2]
The JPATS competition winning design was based on a commercial off the shelf Pilatus PC-9, with minor modifications. Additional requirements and conflicts between the Air Force and the Navy resulted in delays, cost increases (from initial estimates of $3.9 to roughly $6 million per aircraft) and a completely new aircraft that is 22% or 1,100 lbs heavier than the Pilatus.[3]
On April 9, 2007 the U.S. Department of Defense released their Selected Acquisition Reports, which reported that the T-6 JPATS program was one of only eight programs cited for Congressional notification for 2550% cost overrun over initial estimates, which is referred to as a “Nunn-McCurdy Breach” after the Nunn-McCurdy Amendment. It is unusual for a program so far into full rate production to experience significant enough cost overruns to trigger this Congressional notification.[4]
So, yeah. This is the second time Beechcraft has showed up with pretty pictures and promises.
I don’t care who gets the contract, I just don’t want to pay $20 million per unit, but the case is made that the unit is relatively cheap and the training is what is going going to cost. That I can understand.