Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Lockheed: Marine Joint Strike Fighter on Final Approach to Initial Operational Capability
USNI News ^ | June 10, 2014 6:26 PM | Dave Majumdar

Posted on 06/26/2014 10:21:04 AM PDT by robowombat

Lockheed: Marine Joint Strike Fighter on Final Approach to Initial Operational Capability

By: Dave Majumdar Published: June 10, 2014 6:25 PM Updated: June 10, 2014 6:26 PM

A Marine F-35B joint strike fighter lifts off from the runway during the first short take-off and vertical landing mission at Eglin Air Force Base, Fla. on Oct. 25 2013. US Marine Corps Photo

A Marine F-35B joint strike fighter lifts off from the runway during the first short take-off and vertical landing mission at Eglin Air Force Base, Fla. on Oct. 25 2013. US Marine Corps Photo

Lockheed Martin has begun testing the final version of the F-35’s Block 2B software that the US. Marines need to declare the jet operational starting on June 9, company officials told reporters on Monday.

“We are putting the final capability version of the software on the aircraft today and expect to be flying today with 2B in its final drop of software,” Lorraine Martin, Lockheed’s F-35 executive vice president said. “It is possible we will learn things as we go through flight test throughout the summer and into the fall and we have provisioned with the JPO [Joint Program Office] that if we find something we’ve got capacity to go update the software.”

That means all of the capability needed for the U.S. Marine Corps’ initial operational capability (IOC) date with the F-35B short take-off vertical landing variant of the jet in July 2015 is currently flying in test. The software will be verified by the end of the year and released to the fleet in the second quarter of 2015, Martin said

Meanwhile, the government-company integrated test force has flown five sorties with the Block 3i software–which is the configuration the U.S. Air Force requires for its August 2016 IOC date. Block 3i, with the exception of a new third generation helmet-mounted display, offers the same capability as Block 2B other than the fact it runs on newer, faster computer hardware. The new helmet fixes issues with night vision found on the older version of the hardware.

“We did have some integration issues with the hardware itself,” Martin said. “Once we ported the software over, we made no software changes to the application software. It ported clean, but we did have some integration issues that are now behind us.”

She said that the hardware and software are performing extremely well thus far.

The Marines do not need the new hardware for their IOC, but eventually their aircraft will be retrofitted with the new processors.

Martin says that the final Block 3F version of the software will be delivered on time despite concerns from the Joint Program Office that there could be a six-month delay. Martin said the Block 3F code is 80 percent complete with only 170,000 lines of code remaining. “We have plenty of time in my estimation to get the 3F software complete,” she said.

Martin said she has full confidence in the company’s current schedule because the plan is based on the “actual” past performance of the program in developing and testing the 2B software.

“We hit 2B essentially on the nose,” she noted.

If all goes as planned, the final Block 3F will finish testing at the end of 2016 and should be released to the fleet in the third quarter of 2017. The U.S. Navy will declare the F-35C operational with Block 3F software.

Meanwhile, Lockheed anticipates an eighth low-rate initial production contract to be signed in the summer of this year. Martin said that the price of the F-35 drop compared to the last production lot.


TOPICS: Government; News/Current Events
KEYWORDS: aerospace; defensespending; usmc; usnavy

1 posted on 06/26/2014 10:21:04 AM PDT by robowombat
[ Post Reply | Private Reply | View Replies]

To: robowombat

Is this meant to be an “ironic” posting given your previous post?


2 posted on 06/26/2014 10:30:05 AM PDT by stump56 (Freedom isn't free.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: robowombat

3 posted on 06/26/2014 10:30:16 AM PDT by AngelesCrestHighway
[ Post Reply | Private Reply | To 1 | View Replies]

To: stump56

Something like that.


4 posted on 06/26/2014 10:31:04 AM PDT by robowombat
[ Post Reply | Private Reply | To 2 | View Replies]

To: robowombat

Better hurry. The Harriers are falling out of the sky pretty fast. The Harrier is 1960’s technology and showing it’s age.


5 posted on 06/26/2014 11:05:40 AM PDT by pfflier
[ Post Reply | Private Reply | To 1 | View Replies]

To: AngelesCrestHighway

I love that little weed wilter exhaust on the bottom,, quite an intense piece of blowtorch technology.


6 posted on 06/26/2014 11:24:37 AM PDT by NormsRevenge (Semper Fi - Revolution is a'brewin!!!)
[ Post Reply | Private Reply | To 3 | View Replies]

To: AngelesCrestHighway

I don’t care what anyone says, that’s one ugly plane.


7 posted on 06/26/2014 7:48:39 PM PDT by slouper (LWRC SPR 223)
[ Post Reply | Private Reply | To 3 | View Replies]

To: robowombat
Only if they can keep them from self-igniting.

F-35A sustains fire damage during aborted take-off

8 posted on 06/27/2014 6:35:36 AM PDT by Yo-Yo (Is the /sarc tag really necessary?)
[ Post Reply | Private Reply | To 1 | View Replies]

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson