Point taken.
Given the much improved tunneling capabilities in today’s engineering world, would a tunnel be better?
I am referring, of course, to the “Chunnel” between England and FRance.
A tunnel would be a lot more expensive. A tunnel was considered as an option before the original Key Bridge was built. It was deemed too expensive. A cable stayed bridge may not be the cheapest option, but I think it will be the most cost effective option and give a direct hazmat bypass of Baltimore.