Last week I was on it and they had it down to one lane on one side... I got stuck there crawling along bumper to bumper from the 1-35 interchange over that bridge until after the 4th st exit. The constant train of vehicles on that one lane plus all the construction equipment couldn't have been good for the bridge either.
All construction workers that were on the bridge accounted for except for one.