Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: thackney
I wouldn’t tell, except that she had to go home and not return until the next day. If she showed up today (she was going to work) I would not sign her time sheet.

My hat is off to you sir.

11 posted on 07/02/2014 1:39:08 PM PDT by houeto (https://secure.freerepublic.com/donate)
[ Post Reply | Private Reply | To 10 | View Replies ]


To: houeto

There was no way I could tell her to come to work while she was in that daze. I offered to leave the plant and come to her and drive her home but she wouldn’t give me enough info to find her.

The next day she did thank me.

We tried to find time for folks to take off after that, but it was hard.

It was an emergency rebuild of a Methanol Plant after a major explosion. Engineering/Design/Construction 24/7 for about six months.

The plant had several major explosions in the past. The control room was in the middle of the plant. We went out ~10’ and built 18” thick heavily re-enforced blast walls with 10’ thick bases to prevent them from overturning.

A vessel ~60’ tall x 12’ diameter and 1.5” wall thickness had mostly gone to mostly shrapnel shredding many items in the plant. Some pieces landed 1,500’ away and a few traveled through occupied buildings without any real injury.

It was hard to constantly look at the damage and see the massive protections we were putting in place and not start thinking harder about safety.


12 posted on 07/02/2014 2:02:48 PM PDT by thackney (life is fragile, handle with prayer)
[ Post Reply | Private Reply | To 11 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson