Bay Bridge technicians 'listen' for cracking in the steel anchor rods (CalTRans at its finest)
Mercury News ^ | 5/6/13 | Lisa Vorderbrueggen - Contra Costa Times

Posted on 05/06/2013 8:01:34 PM PDT by NormsRevenge

OAKLAND — Strategically positioned high above the water, in a narrow crawl space between the new Bay Bridge deck and the top of its big pier east of the tower, instruments are listening for the sounds of cracking inside steel anchor rods.

Caltrans placed 10 acoustic emission sensors on select rods in early April after some of the massive bolts -- 3 inches in diameter and 17 to 24 feet long -- snapped and triggered widespread worry about the replacement eastern span's seismic safety.

The instrument records the energy produced when a crack initiates, spreads or moves within the rod, said Caltrans materials engineer Bahjat Bagher, who showed off the testing late Friday. But so far, the rods being tested are quiet, a great relief to the agency.

If the bolts -- fabricated in 2010, two years after the 32 bolts that broke -- were also faulty and had to be replaced, the cost to make the $6.4 billion bridge safe for motorists would rise, and Caltrans would face an even greater hurdle to opening the bridge on time.

A second test for hardness is also showing favorable results, although a third saltwater corrosion test is still to come.

"We are pretty confident that we don't have an immediate failure issue with these bolts, but we want to have a strong level of confidence over the long-term," said Toll Bridge Program Manager Tony Anziano.

It's small a piece of good news amid mounting concerns about the $6.4 billion span's ability to withstand the next big earthquake. The long, hefty anchor rods tie the bridge deck and pier columns to the shear keys and bearings that help control sway and uplift during a quake.

(Excerpt) Read more at mercurynews.com ...


TOPICS: News/Current Events; US: California; Your Opinion/Questions
KEYWORDS: baybridge; caltrans; cracking; listen; technicians
Navigation: use the links below to view more comments.
first previous 1-2021-26 last
To: Little Pig

oops, meant inch and a half.


21 posted on 05/07/2013 4:28:20 AM PDT by Spartan302 (Spartans never quit, they come back later with more warriors.)
[ Post Reply | Private Reply | To 14 | View Replies]

To: Yehuda

You can see it but you’re not strong enough to lift it. :)


22 posted on 05/07/2013 4:40:37 AM PDT by ken in texas (I respect my elders but keep finding fewer of them.)
[ Post Reply | Private Reply | To 18 | View Replies]

Comment #23 Removed by Moderator

To: Rodney Dangerfield
Affirmative Action and sub-standard materials on a bridge project.

Thanks for the info. Sounds like a recipe for disaster.

24 posted on 05/07/2013 11:46:59 AM PDT by Veto! (Opinions freely expressed as advice)
[ Post Reply | Private Reply | To 16 | View Replies]

To: yarddog

Note the gap on the center one. It should be snug against the plate.


25 posted on 05/07/2013 11:48:44 AM PDT by Lurker (Violence is rarely the answer. But when it is it is the only answer.)
[ Post Reply | Private Reply | To 6 | View Replies]

To: Cobra64

the blue is where it was before it went bad...then they did not back it off they tried to tighten it back down further and it is still not tight because it is broken.


26 posted on 05/07/2013 12:02:02 PM PDT by superfries
[ Post Reply | Private Reply | To 13 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-26 last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson