Free Republic
Browse · Search
General/Chat
Topics · Post Article

Skip to comments.

GM and Bechtel plan to build thousands of electric car charging stations across the US
CNN ^ | 5/28/19 | Peter Valdes-Dapena

Posted on 05/28/2019 7:48:49 AM PDT by Moonman62

General Motors, America's largest automaker, and Bechtel, the country's largest construction company, are teaming up to build thousands of electric vehicle fast-charging stations across the United States. The two companies have agreed to create a new company that will build the charger network. Adding more fast charging stations should provide a boost to sales of electric cars. One of the biggest concerns Americans have about electric cars is whether there will be enough places to charge them, according to a recent survey by AAA.

This network will not only help GM (GM), which plans to introduce 20 new electric vehicle models by 2023. But the new chargers could also be used by other manufacturers' electric vehicles, too.

GM will provide the data and expertise needed to place chargers in the locations where they can best be used, the two companies said. Bechtel, meanwhile, will provide its own expertise in engineering, building and permitting for the stations.

(Excerpt) Read more at cnn.com ...


TOPICS: Business/Economy
KEYWORDS: automotive; bechtel; cars; electric; elonmusk; falcon9; falconheavy; generalmotors; petervaldesdapena; spacex; transportation
Navigation: use the links below to view more comments.
first previous 1-2021-4041-6061-77 next last
To: RayChuang88
It appears every EV manufacturer except Tesla is standardizing on the SAE J1772 CCS (Combined Charging System) plug. Just that means by 2025, doing fast charging at a commercial charging station could be almost as common as a gasoline station.

The SAE J1772 allows for a common charging port, but doesn't necessarily allow for common fast charging. The CCS port is supposed to allow for fast charging, but if your car isn't equipped for it, the charging station plug won't even fit in your vehicle.


21 posted on 05/28/2019 8:13:58 AM PDT by Yo-Yo ( is the /sarc tag really necessary?)
[ Post Reply | Private Reply | To 9 | View Replies]

To: dfwgator

Forever the future, never the present!


22 posted on 05/28/2019 8:14:34 AM PDT by chris37 (Monday, March 25 2019 is Maga Day!)
[ Post Reply | Private Reply | To 17 | View Replies]

To: Moonman62

Has anyone calculated the impact on the power grid?
Will my AC be going out because too many Teslas are plugged-in at the interstate rest stop?


23 posted on 05/28/2019 8:16:15 AM PDT by Buckeye McFrog
[ Post Reply | Private Reply | To 1 | View Replies]

To: Yo-Yo

I’ve read that every automaker who will make EV’s wants to standardize on the J1772 CCS plug, which allows DC charging up to 350 kW (but it’s likely the DC charging rate will be more like 120-150 kW maximum). Indeed, most of the charging networks now going up in the USA have pretty much standardized on J1772 CCS, which allows the owner to charge at home with 240 volt/30 amp AC power and DC power at commercial charging stations.


24 posted on 05/28/2019 8:18:52 AM PDT by RayChuang88 (FairTax: America's Economic Cure)
[ Post Reply | Private Reply | To 21 | View Replies]

To: dfwgator

“Electric Vehicles are the future, and always will be.”

Yup. Just like the flying car.


25 posted on 05/28/2019 8:24:26 AM PDT by CrazyIvan (A gentleman arms himself for the protection of others.)
[ Post Reply | Private Reply | To 17 | View Replies]

To: RayChuang88

Fore


26 posted on 05/28/2019 8:28:53 AM PDT by gathersnomoss (Welcome to North Mexico, Gringo's...)
[ Post Reply | Private Reply | To 24 | View Replies]

To: Moonman62

And will GM and Bechtel be paying for the necessary upgrades to infrastructure to support more of these charging stations? Current transmission lines and transformers will not support unchecked growth like this.


27 posted on 05/28/2019 8:31:11 AM PDT by Bloody Sam Roberts (Elitist Liberals have no idea the hunger and strength of the beast they have uncaged.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: vette6387

No problem. Magic solar panels will take care of the load.


28 posted on 05/28/2019 8:32:19 AM PDT by Fresh Wind (Trump: "America will never be a socialist country!")
[ Post Reply | Private Reply | To 5 | View Replies]

To: Moonman62

“Why aren’t the electricity producers sounding the alarm?”

They have been muzzled by their government masters, or as in the case here in NorCal with PG&E, they are more concerned with their pending bankruptcy brought about by the wildfires their transmission lines started last year. And the kicker here is that PG&E’s “proposal” to keep from having a repeat performance is that the “plan” to cut off power in any part of their transmission system that runs through the forest, whenever the wind blows! Glad we have a generator!


29 posted on 05/28/2019 8:35:10 AM PDT by vette6387
[ Post Reply | Private Reply | To 8 | View Replies]

To: Yo-Yo

“Are there standards yet for fast charging systems?”

One interesting development is that the next National Electrical Code in 2020 will address bi-directional charging of EVs, homes now charge EVs but soon homes will be charged from EVs in emergency situations.


30 posted on 05/28/2019 8:38:46 AM PDT by Sparky1776
[ Post Reply | Private Reply | To 4 | View Replies]

To: HamiltonJay

“It can grow all it wants, until you can recharge in 10 minutes or less and drive 300+ miles, and have MILLIONS of charging stations, its nothing but a commuter vehicle niche.”

Well, FWIW, we’ve been driving back and forth between the SF Bay Area and Northern Nevada dealing with a new home we’ve bought in Nevada, and we see any number of Teslas on the road with us. They can now go 300 miles and the trip is just under 200. That’s not a “commute!” The real issue is where are they going to get the “juice” to charge them.


31 posted on 05/28/2019 8:39:24 AM PDT by vette6387
[ Post Reply | Private Reply | To 14 | View Replies]

To: Fresh Wind

The RATs love Unicorns! They’re counting on Unicorn Farts to save the day!


32 posted on 05/28/2019 8:40:34 AM PDT by vette6387
[ Post Reply | Private Reply | To 28 | View Replies]

To: vette6387

There’s no doubt about it. Our electric grid is overloaded as it is. You can’t take the energy that’s supplied to autos through the gasoline distribution system and instead impose it on the electricity transmission and distribution system.

The sad irony is those who want EVs are ALSO trying to get rid of sources of electricity.


33 posted on 05/28/2019 8:43:01 AM PDT by Locomotive Breath
[ Post Reply | Private Reply | To 5 | View Replies]

To: Moonman62

Where is the added electric load generation coming from and how is our already shaky transmission system going to handle it?


34 posted on 05/28/2019 8:46:12 AM PDT by Mastador1 (I'll take a bad dog over a good politician any day!)
[ Post Reply | Private Reply | To 1 | View Replies]

To: RayChuang88

And tesla will be forced to comply or compete. In the ensuing melee a victor will emerge and beta max will die again but a lot of capital will be burned up in the meantime and investors will become losers and winners... again.


35 posted on 05/28/2019 8:46:56 AM PDT by Sequoyah101 (It feels like we have exchanged our dreams for survival. We just hava few days that don't suck.)
[ Post Reply | Private Reply | To 7 | View Replies]

To: RayChuang88

Tesla provides a J-1772 adapter with every car. It fits between the Tesla input plug on the car and the (e.g.) ChargePoint charger device.


36 posted on 05/28/2019 8:49:36 AM PDT by rudy45
[ Post Reply | Private Reply | To 7 | View Replies]

To: Mastador1

Where is the added electric load generation coming from and how is our already shaky transmission system going to handle it?

...

Why aren’t the power companies sounding the alarm?


37 posted on 05/28/2019 8:54:56 AM PDT by Moonman62 (Facts are racist.)
[ Post Reply | Private Reply | To 34 | View Replies]

To: pepsionice

Thanks.

We live north of Gay Frisco and never see an Al Gore electric car being charged.

Ironically as our population ages and needs more handicapped parking places, we see these charging stations popping and no additional handicapped parking.


38 posted on 05/28/2019 8:58:46 AM PDT by Grampa Dave (Make Liberals Cry Again by continuing to Make America Great Again! Reelect President Trump in 2020!)
[ Post Reply | Private Reply | To 12 | View Replies]

To: Bloody Sam Roberts

And will GM and Bechtel be paying for the necessary upgrades to infrastructure to support more of these charging stations? Current transmission lines and transformers will not support unchecked growth like this.

...

The power companies say they can handle it.

If they are saying otherwise, please let us know.


39 posted on 05/28/2019 8:59:08 AM PDT by Moonman62 (Facts are racist.)
[ Post Reply | Private Reply | To 27 | View Replies]

To: SkyDancer

“How long does it take to charge one vs how long does it take to fill up with fuel?”

That is an excellent question. My wife’s 15 year old but in great shape Lexus is our main vehicle.

I have a Ridgeline to haul stuff, pick up stuff and go to Home Depot for more new plants. So it gets filled up less often.

With the tank near empty, I can fill it up in less than 5 minutes.


40 posted on 05/28/2019 9:02:28 AM PDT by Grampa Dave (Make Liberals Cry Again by continuing to Make America Great Again! Reelect President Trump in 2020!)
[ Post Reply | Private Reply | To 6 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-4041-6061-77 next last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
General/Chat
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson