I don’t understand the deal about the “New’ Presidential planes.
First off, I do understand hat the latest & very best tech items have to be included in both planes. The President has to be secure.
However-—I don’t understand why it takes 8 years for these planes to be built. During WWII, this country geared up & ws building 13 B-17’s a day, IIRC.
Obama ordered 2 planes that are terribly expensive—which need he very latest & best in electronics—and they won’t be ready for 8 YEARS???
Also-—whee/what is the drop dead point for such electronics to be installed? I don’t think they will go in during the last 2 weeks of construction. So-—who decides when the deadline for the best electronics is reached?
How many seats are used for the Press? Go to using 2 seats only—and call those 2 people ‘The Press Pool’. The rest of them can fly commercial. Or local press people can do the job. The same MSM liars don’t need to be entrenched in the premier seats on AF 1.
Watch Trump carve this down-—waaaay down.
The technical term is Mission Creep
Once the process begins, there is no end
MilSpec 1503-D58
“To prevent the possibility of poisoning, Kleenex boxes must be fabricated from seamless HDPE with a continuous zipper mechanism that changes color when unzipped. Thus, the contents can’t be removed and replaced with life threatening tissues. The box must be designed to fit within lock rails that can be opened by a person with the key that is used to secure nontamper devices on several other rail secured objects as described in Milspec 1503-D”