The fix is building more bridges across the Potomac. 4 bridges minimum. The take Rt 301 from the Richmond bypass and make it an interstate. Build and wider bridge in Rt. 301 and connect up in MD. This plan I have been proposing for the last 30 years was confirmed to work by a Pittsburg PA city planner.
Agreed. The Maryland Transportation Authority (which owns and runs Maryland’s toll facilities) is upgrading the Nice Bridge (US 301) across the Potomac to a 4-lane facility, beginning in 2019, if I remember the year correctly.
4 bridges does sound nice, but the only one that I know of with a possibility of being built is one and associated roadways connecting the Intercounty Connector toll road in Maryland with Route 28 in Virginia.