To: caww
.
”The deal has become so lucrative that Beijing and Moscow created a second pipeline – the Power of Siberia 2. Bullshit. This PoS #2 pipeline will commence construction in 2024 according to FR poster NorseViking who is Russian actually. So--- PoS #2 is still on the drawing boards.
35 posted on
07/28/2022 3:54:55 PM PDT by
dennisw
To: dennisw
You jump too quick - I didn’t say when it was being constructed nor if or not it was on the drawing boards. But it does go hand in hand with China’s belt and road.
41 posted on
07/28/2022 4:40:40 PM PDT by
caww
(O death, when you seized my Lord, you lost your grip on me......Augustine)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson