Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Palo Alto looks to require electric vehicle circuitry in new homes
San Jose Mercury News ^ | 9/28/13 | Jason Green

Posted on 09/28/2013 10:11:23 AM PDT by ProtectOurFreedom

Hoping to play a bigger role in the electric vehicle revolution, the Palo Alto City Council embraced a proposal Monday night that would require new homes to come pre-wired for chargers.

Council members were unanimous in their support for the building code change, which was floated in a colleagues' memo by Mayor Greg Scharff, Vice Mayor Nancy Shepherd and Council Member Gail Price.

The city council also backed related proposals to streamline the process for obtaining a permit for a charger as well as develop strategies to further encourage electric vehicle use in Palo Alto.

"Let's figure out as a council what we can do to remove the obstacles to owning electric vehicles in Palo Alto," Scharff said before the 9-0 vote. "I think what we really need to do is make it convenient, easy and economical."

"The thing that caught me is how simple and easy and fairly inexpensive it is to rough-in the wiring," Shepherd said. The cost is often under $200 for a new home, or four times less than what it runs to install a charger at an existing home, Scharff said.

Several council members noted that Palo Alto was on the leading edge two years ago when it first started pushing chargers, but it hasn't managed to keep pace with a recent surge in demand for electric vehicles.

"They really are starting to catch on and get some market penetration," said Marc Berman, "It is important that we create the infrastructure necessary to allow that to happen. In Palo Alto, of all places, we should absolutely do that."

(Excerpt) Read more at mercurynews.com ...


TOPICS: Business/Economy; Government; US: California
KEYWORDS: calpowercrisis
Navigation: use the links below to view more comments.
first previous 1-2021-4041-46 next last
To: az_gila

Yes because people have no choice but to buy such a house, not like there is any pressure to build a better product without government.

What a stupid thing to say.


21 posted on 09/28/2013 11:26:30 AM PDT by GeronL
[ Post Reply | Private Reply | To 19 | View Replies]

To: GeronL
Yes because people have no choice but to buy such a house, not like there is any pressure to build a better product without government.


Maybe, but only if the average home buyer knows to look for such things as electric outlets...

I bet most don't...

Also, do you think builders would space the 2x4s correctly inside the walls without the code of inspectors... I'm betting a lot would scrimp. Heck, the FL hurricanes exposed builders short cuts and missing hardware to save money.

The pressure to build a better product isn't as clearly defined as you say when it comes to new homes.

22 posted on 09/28/2013 11:37:58 AM PDT by az_gila
[ Post Reply | Private Reply | To 21 | View Replies]

To: az_gila
“code of inspectors”

Bad typing, sorry - should be

code or inspectors

23 posted on 09/28/2013 11:39:30 AM PDT by az_gila
[ Post Reply | Private Reply | To 22 | View Replies]

To: az_gila

As long as people know what they are getting.

I am sitting in a very old shack at the moment with an aluminum roof, there is no running water or power except for an extension cord from next door.

Hopefully though, we can have water and power soon since they have been working on it.


24 posted on 09/28/2013 11:45:01 AM PDT by GeronL
[ Post Reply | Private Reply | To 22 | View Replies]

To: az_gila

What do you have against builders? (:#/>


25 posted on 09/28/2013 11:47:05 AM PDT by BatGuano (You don't think I'd go into combat with loose change in my pocket, do ya?)
[ Post Reply | Private Reply | To 19 | View Replies]

To: ProtectOurFreedom

In other news, advocates of “affordable housing” cannot understand why housing costs so much.


26 posted on 09/28/2013 11:55:24 AM PDT by theBuckwheat
[ Post Reply | Private Reply | To 1 | View Replies]

To: KarlInOhio

>> Do you need 220 to run machine tools to make your own arsenal?

Some of ‘em are 440V, 3-phase. Although you can synthesise whatever you need from 220 if need be. And if you synthesize your machine tool power, there isn’t that telltale 3-phase feed into your garage when the drones come looking for ordnance machine shops. :-)


27 posted on 09/28/2013 12:03:02 PM PDT by Nervous Tick (Without GOD, men get what they deserve.)
[ Post Reply | Private Reply | To 12 | View Replies]

To: ProtectOurFreedom; Ernest_at_the_Beach

I take it they’ve forgotten about the State of California’s critical shortages in electrical generation and distribution capacity.


28 posted on 09/28/2013 12:28:45 PM PDT by Carry_Okie (Islam offers choices: convert, submit, or die.)
[ Post Reply | Private Reply | To 1 | View Replies]

To: Carry_Okie

Is that still going on? I thought they fixed it when they got rid of “Gray-out” Davis.

Haven’t seen anything about brownouts in Cali lately.


29 posted on 09/28/2013 12:30:48 PM PDT by nascarnation (Democrats control the Presidency, Senate, and Media. It's an uphill climb....)
[ Post Reply | Private Reply | To 28 | View Replies]

To: nascarnation
Is that still going on? I thought they fixed it when they got rid of “Gray-out” Davis.

They did improve distribution marginally, but not generating capacity and those improvements were already in process. Frankly, it was price that caused the efficiencies we've seen. So the answer is no.

30 posted on 09/28/2013 12:32:43 PM PDT by Carry_Okie (Islam offers choices: convert, submit, or die.)
[ Post Reply | Private Reply | To 29 | View Replies]

To: NVDave

“...If I were advising someone building a new house, I’d recommend at least 100 amp, 240V service run to the garage or shop as an “of *course* you’re going to need that” sort of thing....”

A number of years ago, I had a 30 x 30 foot 2-car garage built. Put three rooms over (unfinished) just because. The electric service was a 100A sub panel, and I did most of the wiring. Thought we might need another heat pump some day. Put in one 30A 240V outlet, just in case we might need it.

Fast forward:

Now the “garage” contains a 2,400 lb. vertical mill, 1,900 lb. lathe (and two smaller ones), 5 H.P. 3-phase RPC, several welders (water-cooled Syncrowave 250 TIG/stick, Dialarc 250, Thermal Arc 161STL, Lincoln SP175+ MIG and 1952 vintage AC180C, Miller spot welder, Victor & Smith O/A torches), table, radial arm and chop saws, wood lathe, two jointers, three drill presses, a 20-ton hydraulic press and a sandblasting booth, 3.5 H.P. 60 gallon air compressor, two band saws and a 400 pound granite surface plate, plus three work benches. And a lot of hand tools. Moma’s spare oven is in there, too. Good thing we are skinny.

Now the panel supports separate 30, 50 and 70 Amp, 240V circuits for the big stuff. Five separate 20A, 120V circuits and I forget how many 15A lighting and whatnot circuits. Fortunately, I had two 150A main panels to start with. I can live with 300A service (320), but 400 would have been better. I did most of the routine wiring and let an electrician do the main panel and sub panel connects. I spent days and days going up and down a ladder and yanking wire.

Since I did that, my younger one has become a quite competent machinist/welder. Good with all welding processes (though not a pipeline welder), knows his G-code and MasterCAM for CNC machining.


31 posted on 09/28/2013 12:37:28 PM PDT by USMCPOP (Father of LCpl. Karl Linn, KIA 1/26/2005 Al Haqlaniyah, Iraq)
[ Post Reply | Private Reply | To 14 | View Replies]

To: az_gila

Around here in Dupage County IL;it is often required to bring the house up to today’s code, prior to sale.

For my 100 year old home a minimum of $1,000+ to run from the new 200A service in the back to the unattached garage in the front. Lots in the way.


32 posted on 09/28/2013 12:38:04 PM PDT by DUMBGRUNT
[ Post Reply | Private Reply | To 19 | View Replies]

To: ProtectOurFreedom

If my house comes pre-wire for the charger then I don’t need a stinking permit!


33 posted on 09/28/2013 12:43:26 PM PDT by Lockbox
[ Post Reply | Private Reply | To 1 | View Replies]

To: Carry_Okie

That’s incredible.
All those rich people enduring 3rd world electricity availability.


34 posted on 09/28/2013 12:44:48 PM PDT by nascarnation (Democrats control the Presidency, Senate, and Media. It's an uphill climb....)
[ Post Reply | Private Reply | To 30 | View Replies]

To: nascarnation

wait until it hits the fan and these people figure out they moved to the wrong state


35 posted on 09/28/2013 12:46:07 PM PDT by GeronL
[ Post Reply | Private Reply | To 34 | View Replies]

To: BatGuano
What do you have against builders? (:#/>


Nothing, but I am a retired engineer and can follow what they do when working on anything that is mine...:^)

36 posted on 09/28/2013 12:58:53 PM PDT by az_gila
[ Post Reply | Private Reply | To 25 | View Replies]

To: DUMBGRUNT
Around here in Dupage County IL;it is often required to bring the house up to today’s code, prior to sale.

For my 100 year old home a minimum of $1,000+ to run from the new 200A service in the back to the unattached garage in the front. Lots in the way.


I agree, existing stuff should be grandfathered in.

But the OP talked about new construction only.

37 posted on 09/28/2013 1:00:23 PM PDT by az_gila
[ Post Reply | Private Reply | To 32 | View Replies]

To: USMCPOP

You and I should get together sometimes. Sounds like we have a lot in common in our shops.

FWIW, Look into the Miller Dynasty welders. The Syncrowaves are great machines, don’t get me wrong, but the Dynasty machines take sooo much less power - and you get a lot more pulse/waveform options on them. I like my Dynasty 200 for welding on guns. For the big stick stuff, I have a Trailblazer outside the doors.

In the future, I want to get a CNC bed mill. I’ve been eyeing some of the smaller Haas mill/lathe setups, like their “toolroom” machines. Trouble is, they’ve been forced to add “features” I don’t want or need for the Euro-weenie market that increase weight and footprint, so I might also look at some of the Taiwanese machines. I reckon I have to keep the weight under 7K in order to not crack the pad as I’m moving it around. The people who built the shop I’m in now didn’t think that concrete was very important - they poured only 4”. I’d like 6, better 8”. Everyone around here is stingy with the concrete in both residential and commercial pad pours.


38 posted on 09/28/2013 1:21:42 PM PDT by NVDave
[ Post Reply | Private Reply | To 31 | View Replies]

To: Nervous Tick

For motors 5HP and under, look at VFD’s. They’re a much cheaper alternative to putting in a rotary, and far, far better than a static phase converter.

For big conversion issues, there’s a new outfit that sells solid-state phase conversion that is very nice. Quiet, efficient, good regulation. Google/Bing “Phase Perfect.”


39 posted on 09/28/2013 1:24:18 PM PDT by NVDave
[ Post Reply | Private Reply | To 27 | View Replies]

To: az_gila

Ever notice how contractors just LOOOOOVE engineers looking over their shoulders? ;-)


40 posted on 09/28/2013 1:24:52 PM PDT by NVDave
[ Post Reply | Private Reply | To 36 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-4041-46 next last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson