There’s a joke in there somewhere about changing horses mid stream. But alas, it is intuitively small. So I will abandon this humor ship mid stream. In before someone retorts ‘that ferry never left the shoreline.’
Well, whatever floats their boat.
Engineers are not perfect. I have done lots of process designs for example but will not go past a certain point in the process without a reviewer. I will go further in the process if there is a formal QA/QC procedure to work within. There is still a line though that I stop at. Other experts need to step in to review in detail and tweak where necessary. Typically, I will have the full range of detail engineers reviewing and expanding on my process design. Again, typically I will be a reviewer of their work to assure that the process intents are carried forward. The 3rd party review is a normal part of the give and take.
Engineers are not perfect. I have done lots of process designs for example but will not go past a certain point in the process without a reviewer. I will go further in the process if there is a formal QA/QC procedure to work within. There is still a line though that I stop at. Other experts need to step in to review in detail and tweak where necessary. Typically, I will have the full range of detail engineers reviewing and expanding on my process design. Again, typically I will be a reviewer of their work to assure that the process intents are carried forward. The 3rd party review is a normal part of the give and take.